Amine scrubbing BGAA biogas upgradingDGE
Aminwäsche BGAA Biogasaufbereitung
Amine scrubbing BGAA biogas upgrading
DGE
Aminwäsche BGAA Biogasaufbereitung
ONO plus VAT
€80,000
Condition
Used
Location
Weiskirchen 

Show images
Show map
Machine data
- Machine type:
- Amine scrubbing BGAA biogas upgrading
- Manufacturer:
- DGE
- Machine number:
- -
- Condition:
- refurbished (used)
- Functionality:
- fully functional
Price & Location
ONO plus VAT
€80,000
- Location:
- Zum Eichenlaubhof, 1, 66709 Saarland - Weiskirchen, DE
Call
Technical details
- Pressure:
- 0.1 bar
Details about the offer
- Listing ID:
- A19034706
- Update:
- 07.08.2025
Description
Selling an amine scrubber, for example, for upgrading biogas to biomethane (natural gas quality).
Capacity in the biogas range: 450-550 Nm³/expandable to 650 Nm³/h
Up to 99.9% methane purity
Methane slip: 0.1%
Electricity requirement: 0.06 kWh/m³ raw gas
Heat requirement: 0.65 kWh/m³ raw gas
Simple CO2 extraction possible - liquefaction/dry ice
No exhaust gas treatment required compared to the membrane process with a lean gas burner - clear cost savings
Scrubber regeneration is equipped with heat recovery at 55/65 degrees Celsius
Kdedjwf Rwwspfx Aabju
The plant can be expanded for the production of LNG with a CO2 content of less than 30 ppmv and less than 0.1 ppmv of water.
The amine process is exceptionally robust against impurities in the biogas stream and is characterized by high Plant availability is a factor. Compared to the membrane process, the amine scrubbing technology is significantly less sensitive to volatile organic compounds (VOCs; terpenes, ketones, siloxanes).
Plant immediately available/short delivery time
If you have any questions or are interested, please contact us by phone.
Amine scrubbing BGAA Biogas upgrading Biomethane Biogas CHP CO2 separator CNG LNG
The listing was translated automatically. Translation errors are possible.
Capacity in the biogas range: 450-550 Nm³/expandable to 650 Nm³/h
Up to 99.9% methane purity
Methane slip: 0.1%
Electricity requirement: 0.06 kWh/m³ raw gas
Heat requirement: 0.65 kWh/m³ raw gas
Simple CO2 extraction possible - liquefaction/dry ice
No exhaust gas treatment required compared to the membrane process with a lean gas burner - clear cost savings
Scrubber regeneration is equipped with heat recovery at 55/65 degrees Celsius
Kdedjwf Rwwspfx Aabju
The plant can be expanded for the production of LNG with a CO2 content of less than 30 ppmv and less than 0.1 ppmv of water.
The amine process is exceptionally robust against impurities in the biogas stream and is characterized by high Plant availability is a factor. Compared to the membrane process, the amine scrubbing technology is significantly less sensitive to volatile organic compounds (VOCs; terpenes, ketones, siloxanes).
Plant immediately available/short delivery time
If you have any questions or are interested, please contact us by phone.
Amine scrubbing BGAA Biogas upgrading Biomethane Biogas CHP CO2 separator CNG LNG
The listing was translated automatically. Translation errors are possible.
Seller
Note: Register for free or log in, to access all information.
Registered since: 2023
Send inquiry
Telephone & Fax
+49 6876 ... show
Your listing has been deleted successfully
An error has occurred