Gas-powered combined heat and power plantMWM-Energy Solutions
TCG2020 V20
Gas-powered combined heat and power plant
MWM-Energy Solutions
TCG2020 V20
EXW ONO plus VAT
€4,50,000
Year of construction
2016
Condition
Used
(fully functional)
Location
Eberdingen 

Machine data
- Machine type:
- Gas-powered combined heat and power plant
- Manufacturer:
- MWM-Energy Solutions
- Model:
- TCG2020 V20
- Machine number:
- 2212725
- Year of construction:
- 2016
- Condition:
- used
- Functionality:
- fully functional
- Operating hours:
- 30,000 h
Price & Location
EXW ONO plus VAT
€4,50,000
- Location:
- Eberdingen, Germany

Call
Technical details
- Type of input current:
- three-phase
- Power:
- 1,999 kW (2,717.88 HP)
- Input voltage:
- 400 V
- Control cabinet width:
- 800 mm
- Control cabinet length:
- 3,000 mm
- Control cabinet height:
- 2,400 mm
- Rotational speed (min.):
- 1,500 rpm
- Rotational speed (max.):
- 1,500 rpm
- Total height:
- 3,200 mm
- Total length:
- 16,000 mm
- Total width:
- 3,200 mm
- Fuel:
- domestic gas H
- Overall weight:
- 45,000 kg
- Type of cooling:
- water
- Nominal power:
- 1,999 kW (2,717.88 HP)
- Nominal power (apparent):
- 2,000 kVA
- Input frequency:
- 50 Hz
- Input current:
- 250 A
- Equipment:
- documentation/manual
Details about the offer
- Listing ID:
- A22800580
- Reference number:
- BHKW Nr.4
- Update:
- 22.09.2026
Description
The CHP unit is used in the horticultural operation to supply electricity. It can operate in parallel with the grid or in island mode. It is maintained by the manufacturer under a full-service contract. It is in good condition and fully functional. The container is spacious and very comfortable for service work. The generator is connected to the circuit breaker via a copper busbar system, ensuring high quality. The container temperature is controlled automatically via electric sunshades. The switch room is heated and air-conditioned. An EMI box is installed for continuous NOx measurement. A 15-meter chimney is located on the roof. A ladder for exhaust gas measurement is included. The unit is sold “as is” for pickup at the premises. The sale is due to a change to wind power generation. The service contract, valid up to 60,000 operating hours, can be taken over if desired and possible. It is a perfectly designed container, extremely spacious and solidly built! It is intended to remain in operation until December 1, 2026. If necessary, it can also be dismantled immediately. We would be happy to arrange a viewing and demonstrate its operation.
Ljdjz D Ihfspfx Ab Usrt
The listing was translated automatically. Translation errors are possible.
Ljdjz D Ihfspfx Ab Usrt
The listing was translated automatically. Translation errors are possible.
Seller
Note: Register for free or log in, to access all information.
Last online: A week ago
Registered since: 2026
1 listing online
Send inquiry
Telephone & Fax
+49 7042 ... show
These listings may also fit your interest.
Success:
Your message has been sent.
Listing
Area P.i.p
6,784 km
Generator
JenbacherJGS 620 / 624 GS-N.L
JenbacherJGS 620 / 624 GS-N.L
Success:
Your message has been sent.
Listing
Germany
6,878 km
Laser metal welding machine
EMAGELC 160 DUO
EMAGELC 160 DUO
Success:
Your message has been sent.
Listing
Grävenwiesbach
6,898 km
Laser welding system
ARNOLD20435 DCS
ARNOLD20435 DCS
Success:
Your message has been sent.
Listing
Maleo
6,798 km
Block heat and power plant
Caterpillar2020
Caterpillar2020
Your listing has been deleted successfully
An error has occurred


















































































































